Sunday, January 26, 2020

Quantity Surveying And Construction Management Construction Essay

Quantity Surveying And Construction Management Construction Essay The Qatar Construction Industry aims to form a complete waste management plan make honest with the state master plan and with a strong stress on recycling. The targets are to recycle 38 % of solid waste, up from the current 8 %, and cover domestic waste group at 1.6 kg/day, the Qatar National Development Strategy (NDS) 2011-2016 has exposed. Qatar produces more than seven hundred thousand tonnes of solid waste every one day. Much of it is crowded into landfills, with the underdeveloped recycling industry handling only 8 % of the waste At presently 91 % of nondomestic waste is taken in a straight line to landfills, and the bulk of what is eventually recycled is picked through by companies that sift through the waste at the landfills. Qatar will take on an involved strategy to cover the levels of waste produced by industry and to recycle much more of what waste is produced. The government published a policy text (QSAS) in 2010 in order to try and initiate better waste management activities within the construction sector. This chapter appraises to introduce the dissertation according the following sections: background of the research; the research aim and objectives, outline methodology for the research; and the structure of the dissertation. The purpose of this chapter is to explore the background of the research set out the setting for details of the dissertation, the importance, and further more continue with an exploration of the research aims and the chapter conclude with an outline of the objectives; literature review, data collection and analysis. Its comprise the entire chapter which are contain in the dissertation and finalize with an explanation of the dissertation structure. BACKGROUND The waste management has been a long issue worry for the public, Increasing the Amount of waste by increasing the population producing, therefor continually been a concern that where waste drives or sprits. It is being determined by the most economically feasible selection and with slight concern for the earth natural environment The principal importance is in waste escaping. Waste reduction can be defined as any technique, process or activity which avoids, eliminates or reduces a waste at its source, typically within the confines of the production unit (Williams, 2005). Producers must take responsibility for creating long-term produces with increased durability (Cooper, 1994). Waste decrease is the main to reducing the rising waste mountain and that is the main to sustainable waste management. In a construction site whether you can be as a contractor, subcontractor, site director or a site member of staff, discovery that how to reduce, reuse and recycle construction wastes is important. It will not only benefit to save money at site, but it also permits you to pay an important part to reduce the construction harm that construction waste effects to the environment. AIM The aim of the research is to identify and establish sustainability of waste reduce, reuse and recycle the waste in construction industry and analyzing the real presentation in the Doha Qatar Construction Industry. OBJECTIVE To identify the percentage waste management practice within the construction industry in relation to barrier/block. Finding out how does the waste in construction been produced To identify the answers why wastes are arise in construction site and the solution on it To identify the solutions for incredulous barrier and recommend more sustainable methods. To identify the feasible answer to overcome barrier and to advise practical recommendation using best available method on how waste can be achieved advance sustainably. Identify the solution for solving the waste reduce, reuse and recycle the waste for a better environment. OUTLINE RESEARCH METHODOLGY The Outline of the research methodology is limited to literature review, data collection and analysis. The involved review of establish waste management theory form Books, journals and internet finding. The important concerns were found on this research to explore more and from the research exploration to be used questionnaires to assembled facts. The exploratory questionaries assemble to enlarge the research in an excellence method. The questionnaires was focused more than 150 organization within the Doha Qatar Construction Industry and the inquiry was mainly conducted through the Email and online questionnaires The data which are collected would then be analyzed to gain a conclusion towards the dissertation. More details about the methodology are mentioned in chapter 4 of this dissertation. STRUCTURE OF THE RESEARCH The dissertation is basically contains three main parts which are introduction, literature review and analysis of the collected data through questionnaires. The dissertation subject into six chapters, start with the introduction of the waste management, its comprising background to the study, aim and objectives and the explanation for undertaking the research. The second chapter comprises the concept of the waste and waste management. The three chapters comprise the concept of alternative materials used in construction. The chapter four comprises the research methodology used to data collection. The chapter five comprises analysis the questionnaires result consequence and discussion of the essential discovery for the research and the final chapter six completes the research process review and recommendation. SUMMARY The chapter set out to introduce the through a discussion of background to the research, its aim and objectives, the methodology to be employed and the details of the dissertation content. The research mainly concern to the aim of the dissertation is to explore sustainable waste management in Doha Qatar Construction Industry and explore the research objectives of the research. As a final point, the chapter accomplishes with an account of the dissertation structure. CHAPTER two Literature review CHAPTER TWO LITERATURE REVIEW 1. INTRODUCTION The chapter primarily comprise the basic principal of sustainable waste management within Doha Qatar Construction Industry. It is mainly focussing the alternative material recovered and recycled form the construction waste as well. And review of the percentage construction industry in Doha Qatar. 2. WASTE MANAGEMENT SYSTEM The Waste management in construction needs planning as it is a necessary portion in the commencement of the tendering and in the complete project planning. Construction planning is completed in feature, the way to deliver the project on period, the quality of the project and within an proper financial plan. (Karim. K, 2000) A related method wants to be completed for waste management also. A waste management plan is a main portion of the route, similar other planning basics of the planning development. Generally in obverse area of the project place will be used as a loading area, by means of the material which are approaching to the site can be kept at this point and the back part will be used for storage the waste material, which will be kept in not the same hops, and little by little transported on view of the site with a loading truck (Guthrie and Mallet, 1995). The whole of labors on site want to be well knowledgeable around the method and techniques that are predictable of them in respects to reusing and recycling produces. Definite coloured baskets will cover convinced kind of waste. There would be baskets for recycling and rubbish mainly, every time the baskets are full, they will be deserted in the filling trucks, and in turns transported off site for further practices. In advance, the works bring into being, let easy right to use to storing zones to make sure that the materials are secure from some damage, and also let every single worker know where to discovery the storing zone for the specific kinds of materials. It is greatest to stock the materials away from waste materials. 2. CONCEPT OF WASTE MANAGEMENT The waste management is the conduct of waste materials. It can be almost anything and a primary objective of waste management today is to protect the public and the environment from potentially harmful effects of waste. The waste material is harmful by product of building progression in the construction sector and waste management is an essential method of finding and trating waste in order to minimize (BRE, 2003). One of the largest waste producers is the construction industry and the waste is producing 32 tons for disposal per year [Over view Construction waste in Doha Qatar, 2007]. 3. RECYCLING AND RECOVERY The recycling and recovery is the point if the waste cannot be re-used. Recycling and recovery only be carry out when the product no bigger functions or cannot be repaired (Cooper, 1994). Recycling can be defined as the followings; Collection Separation Clean-up Processing To produce the market productivity, Williams (2005) 4. WASTE TREATMENT The waste to reduction is going to landfill. Alternative waste treatment which create a negligible impact on environment as following; Recycling Composting Energy from waste Mechanical Biological Treatment Pyrolysis Gasification Combined pyrolysis-gasification Anaerobic digestion Mechanical Heat Treatment. Williams (2005). 5. KEY CONCERNS ON CONSTRUCTION WASTE The Qatar Construction Industry aims to form a complete waste management plan make honest with the state master plan and with a strong stress on recycling. The aims are to recycle 38 % of solid waste, up from the current 8 %, and cover domestic waste group at 1.6 kg/day, the Qatar National Development Strategy (NDS) 2011-2016 has exposed. Qatar produces more than seven hundred thousand tonnes of solid waste every single day. Much of it is crowded into landfills, with the underdeveloped recycling industry handling only 8 % of the waste. The Domestic waste about 30 % and, with nondomestic waste from construction industrial accounting for the rest. At this time 91 % of nondomestic waste is taken in a straight line to landfills, and the bulk of what is eventually recycled is picked through by companies that sift through the waste at the landfills. Qatar will take on an involved strategy to cover the levels of waste produced by industry and to recycle much more of what waste is produced. Ministry of Department of Environment MoE (2022) classify that the construction and demolition waste into five groups which are following; Construction and renovation- wood, roofing, fixtures, wall board, ductwork and piping, insulation materials and carpet. Roadwork- asphalt, concrete and earth filling. Excavated- earth, sand and stone. Building demolition- mixed rubble, concrete, steel beams and pipes, bricks, timber, fixture and fitting wastes. Site clearance- trees, brush, earth and the potential for mixed concrete rubble and sand. Most of the issues contribute to the construction waste generation on site. Most usually documented sources of construction waste are design, operational, material handling and procurement. Designated that the considerable amount of construction waste on site is directly associated to design mistakes. The construction industry is nature; it is essential that relies on good communication and close intersection for positive project delivery. It is mean the practical waste reduction strategies can only be expressed and implemented when interested party understand the original and reasons of the construction waste. 5. DIRECT AND INDIRECT WASTES Indirect wastes are always producing from the design stages of the construction project. These wastes are able to be preventing by having a good waste management, planning and foresight and as for direct wastes are produce form the construction project progress stages (Chris, 2009). 5.1 DIRECT WASTES Substitution of other material Impropriate scale of drawing have been produce Builder error such as over-digging in dimension and incorrect setting out Return of work to complete unfinished work. 5.2 INDIRECT WASTES Transport waste Site storage Conversation and cutting waste Material handling Lack of management in construction project Streaming from material that are wrongly specified 5. THE WASTE HIERARCHY The Gulf Cooperation Council GCC states accepted a continuous waste management scheme and a specialist upkeep trick for waste making, collection, sorting, treatment and disposal. Most of the waste management creeds and plans applied are based on universally recognized scientific method counted in Waste Management Hierarchy as shown on figure 00. Description: C:UsersirfanDesktop186567195.gif Figure 00: Waste hierarchy Source: http://www.frost.com/prod/servlet/market-insight-top.pag?docid=186566927 Description: C:UsersirfanDesktop186567198.gif Figure 00: Waste hierarchy Source: http://www.frost.com/prod/servlet/market-insight-top.pag?docid=186566927 The waste is escaping in the best perfect choice in the hierarchy. The theory dishonesties within the basis of not making the waste during the construction doing. 6. LANDFILLS IN DOHA QATAR The waste management located in Mesaieed in Doha Qatar is expected to decrease the waste disposed of in landfill to 3 % to 5 %, in this manner reducing the share of total waste sent to landfill from 92 % to 64 % (http://www.thepeninsulaqatar.com). The proficiency also will alter waste to energy and rise the level of waste recycling form 8 % to between 20 % and 25 %. It will be the five transfer positions as South Doha, West Doha, Industrial area, Dukhan and Al khor. Prepared with collection bunkers for splitting reusable such materials as concrete (aggregate), concrete (Block) metal (steel), timber and, glass are be % case in points of how companies can create practice or use of such materials. This will be helped to minimise the waste generation in the Qatar Construction Industry. The Qatar Construction Industry aims to form a complete waste management plan make honest with the state master plan and with a strong stress on recycling. The targets are to recycle 38 % of solid waste, up from the current 8 %, and cover domestic waste group at 1.6 kg/day, the Qatar National Development Strategy (NDS) 2011-2016 has exposed. At % 91 % of nondomestic waste is taken directly to landfills, and the bulk of what is eventually recycled is picked through by companies that sift through the waste at the landfills. Qatar will take on a involved strategy to cover the levels of waste produced by industry and to recycle much more of what waste is produced. 7. TREND OF WASTE GENERATION IN DOHA QATAR In December 1997, the Gulf Cooperation Council GCC countries adopted a uniform waste management system and an detecting instrument for waste production, collection, sorting, treatment and disposal. Most of the waste management regulations and strategies adopted are based on universally accepted scientific approach enumerated in Integrated Waste Management Hierarchy. 186567197 Figure 00: Waste Trend Source: http://www.frost.com/prod/servlet/market-insight-top.pag?docid=186566927 8. WASTE MANAGEMENT IN DOHA QATAR CONSTRUCTION INDUSTRY The Qatar Ministry of Environment MoE has arranged the fresh standards for the construction and demolition of waste material, defining what are the materials are satisfactory for recycling and re-usable in the construction industry in Doha Qatar. The new standard have been arranged with a view to establishing a fresh waste management talent, in positive techniques like to the Ministry of Environments Domestic solid waste management centre already in process near to Mesaieed Industrial City. The MoE said that a new facility to form neat the existing landfills to process Twenty Thousand tonnes of construction waste produced in Doha Qatar Industry. Around 40-50 % of construction and demolition waste is re-useable, but at the moment most of it is deposited in landfills. The following Table 00, 00 are display the arrangement of waste produced during the construction activities in Doha Qatar. NO DESCRIPTION OF MATERIALS WASTE 1 Timber 38 % 2 Soil 18 % 3 Plastic 11 % 4 Cardboards 8 % 5 Metals 8 % 6 Hard Materials 8 % 7 Bio Organic 5 % 8 Cast formless 2 % 9 Gypsum 1 % 10 Chemicals or Paint 1 % Table 00- Doha Qatar Construction Waste Arrangement Source: Qatar Construction Site (http://www.qc-sites.com/) No Description of Materials Waste Type Waste 1 Timber 46 % 38 % 2 Soil 38 % 18 % 3 Plastic 46 % 11 % 4 Cardboards 46 % 8 % 5 Metals Recyclable 8 % 6 Hard Materials 38 % 8 % 7 Bio Organic 46 % 5 % 8 Cast formless 38 % 2 % 9 Gypsum 46 % 1 % 10 Chemicals or Paint Hazardous 1 % Table 00- Doha Qatar Construction Waste Arrangement Source: Qatar Construction Site (http://www.qc-sites.com/) 9. RECOVERY OPTIONS The Qatar aims to establish a wide ranging solid waste management plan aligned with the master plan and with the strong on recycling. Recovery is defined by the QDS in its document, assistance on MWMS as the worth to gain value form waste through recycling, other form of material, or recovery of energy and compositing. The Doha Qatar target to recycle 38 percentage of solid waste, up from the percentage 8 %, and contain domestic waste group 1.6kg/ day, the Qatar National Development Strategy QDS 2001 to 2006 has revealed (QDS 2009). Therefor gives value to waste, and attempts to create a situation where the landfill of waste, becomes an economically un-viable disposal route (Waite 1995). 10. RECOVERIES AND ENERGY FROM WASTE The recovery from waste as well-defined within the Waste Strategy is to achieve done of the followings. The statutory recovery targets as set by the Doha Qatar Ministry of Environment (MoE) are; Composting Recycling Energy Recovery Other forms of Materials Recovery Source: QSAS 11. WHAT IS SUSTAINABLE CONSTRUCTION Sustainable construction is meeting environmental and social duties, and same while successful effectiveness. The important features of sustainable construction are similar to those set for sustainable development. The end result is to decrease a firms detrimental things on the environment. Sustainable construction is usually used to describe the application of sustainable development to the construction industry, and balances 4 elements are following; Effective protection deed of the environment Prudent use of natural resources Social growth which recognizes the wants of everyone Maintenance of high and stable levels of economic growth and employment (CIRIA1, 2001). The industry is distinct by a number of subdivisions, all who plan, design, build, alter or maintain the built environment. Also its subsidiaries, those who making materials, suppliers, and end of life occupiers or owners. The entire life cycle of any structure, from initial concept to demolition must be encompassed in the meaning of sustainable construction. Buildings and structures alteration the face of towns and countryside, and their construction, use, repair, maintenance, and demolition consume vast amounts of energy and resources compared to many other industrial sectors, (DETR, 2000). 13. WHAT THE CONSTRUCTION INDUSTRY CAN PREPARE There is the first step in moving to sustainable development; it is recognizing the strategic benefits of business environmental management can carry and to ensure that commitment to the environmental development exists in company (Welford1, 1998). In business, the concept of sustainability also embraces the three themes of the environment, economy and society. Bring changeover to sustainable construction, individual firms must comprehend and receive the devastating things their activities are having upon the environment, and the status of operating in an environmentally friendly manner. They will then have to commit to not only approving to modification how they function, but really set up a pro-active outline for all employees, suppliers, and sub-contractors to adhere to. Sustainable businesses that show social corporate responsibility profit financially through more efficient actions and use of resources expand their corporate image; and maintain a modest advantage, (MaSC, BRE, 2005). There are a number of steps firms can take towards sustainable construction, as identified by CIRIA, (2000). Create a commitment to address their influences Aim to be the finest and standard their performance Life cycle costs of products and their impacts Communicate with stakeholders with environmental and social reports Work with others in the supply chain to increase the act Develop staff awareness through training 14. PROFITS OF SUSTAINABLE CONSTRUCTION The ten themes for action discussed above simply make good industry intelligence, e.g. designing a project for minimal waste (DTI1, 2003). 14.1 ENVIRONMENTAL Sustainable act can deliver significant business efficiency success. Thin construction and pollution deterrence can create the calculable cost savings. Recycling further waste material will minimize landfill tax and material purchasing costs. Improve competence through regulatory obedience Improve public and enhanced particular standing. Evasion of pollution events, averting penalties, law court overheads and bad public relations. 14.2 SOCIAL Improving proof of output improvements for staff complicate in environmental and social presentation improvement provisions. Commencing a social viewpoint, financial aids rise from better affairs with the clients, local groups and other sponsors. Well health and safety performs to develop competence and minimize accidents, saving both managerial time and legal costs and fines. 14.3 ECONOMICAL There are significant chances available to improve or stand marketplace Point. Making and business Doings will not be forced by local opposition, regulatory bodies or client necessities. Improving project supply is essential to construct trust with the clients, improve success and advantage. Inspire mutual, favorable long term relations with the clients. Source: CIRIA1, 2001 15 THE TEN THEMES FOR SUSTAINABLE CONSTRUCTION The essential to develop performance in the construction industry is necessary for it to become more sustainable. Managing and decreasing the environmental influences of buildings and structures, and the methods of construction, is a common starting for many organisations wishing to address sustainability (DETR1, 2000). Re- use existing built assets, and renovate which develops their sustainability, where likely. Design for minimum waste. Design out waste at all stages of product, building or structure, think about using recycled materials. Aim for lean construction, working on continuous improvement and high quality work. Decrease energy in construction; be aware of energy consumption during construction. Decrease energy in use, consider more energy efficient solutions in the design stage. Do not pollute, understand environmental impacts and adopt an EMS or ISO to manage. Preserve and enhance biodiversity throughout the construction process, from extraction of materials to landscaping buildings. Conserve water resources, design for water efficiency in buildings. Respect people and their local environment, be responsive to community and consider your workforce. Set Targets to measure and compare your performance against others, set targets for Continuous improvement. (DETR1,2000 DTI1, 2003) 16. CONCLUSIONS The Chapter is generally defining to establish recommendation for Sustainable Waste Management in Doha Qatar Construction industry. The chapter will review the research objective of the dissertation; the chapter will then come to an end with an investigation of suitable recommendation of regarding Sustainable waste management system in Doha Qatar construction industry. CHAPTER three Alternative materials for construction CHAPTER THREE ALTERNATIVE MATERIALS USR FOR CONSTRUCTION 1. INTRODUCTION Maximum of the waste will be produced from the construction industry and the source of the waste is produced must be known at the early stage as it will expansion good effect in waste management development. The materials identical like concrete (aggregate), concrete (Block) metal (steel), timber and glass. 2. CONCRETE (AGGREGATE) Each quantity of concrete waste that is recycled for aggregate in fresh concrete would protect almost a quantity of key aggregate that comes from the countryside or dredged from the seas. Recycling concrete keeps money, and has further environmental aids. 2.1 THE KEY REASONS OF THE WASTE OF CONCRETE ON THIS SITE COMPRISE Unexpected modifications on design Improper proportions of aggregate, water and cement Purchasing too much Over pouring Pumping waste Incorrect use of material 2.2 METHODS IN WHICH TO RECYCLE CONCRETE Recycle the concrete and use it as aggregate for other local site as new concrete; it will protects/save the aggregate and waste disposal charges. The Recycle concrete waste as sub base in roads or fill-in works. The leftover aggregate can be transported off the site, by the loading vehicles as soon as the endorsed sum has been used on site. concrete-disposal Figure 0: Concrete Waste (Aggregate) Source: http://civilpents.blogspot.com/2012/02/recycled-concrete-aggregate.html 3. CONCRETE (BLOCK) Approximately 6 % to 28 % of concrete blocks results in waste in construction (QCS. 2007). 3.1 THE CHIEF BASES OF THE WASTE OF CONCRETE BLOCKS COMPRISE Unexpected changes on design Over purchasing the quantity Incorrect conduct of the blocks and stacking The arrangement of the concrete walls and the columns 3.2 METHODS IN WHICH TO RECYCLE CONCRETE BLOCKS COMPRISE Practice greater pieces for erosion control Castoff as a substitute for landscaping stone Castoff as new aggregate for other sites Castoff as sub base on new roads 3.3 RECYCLING CONCRETE WASTE Initially, when the concrete waste has been elated from the baskets on site to the loading trucks to be additional elated off-site, we need to discover, waste of concrete can be used for it, Then eliminate whatever within the concrete that could contaminate the concrete, (CIRIA, 1995) and then crush the concrete with a mobile crusher to the size of aggregate, if need be. Then store the crushed concrete in a separate area, so no other materials are dumped there. Then use it for other requirements. Construction Waste Recycling Figure 00: Concrete Waste (Block) Source: http://www.ds-crusher.org/sloution/Construction_Waste_Recycling.html 4. REUSE OF METAL (STEEL) RECOVERED FORM WASTE Steel is an ideal material to recycle. In fact 30% of all steel products in construction are now made from recycled steel (Guthrie, P M, 1997) and the steel waste in construction it is able to recycle up to an approximately 90% of the total (Karim. K, 2000). 4.1 CAUSES FOR METAL WASTE Over-ordering Faulty workmanship Incorrect handling Improper type of metal Scope of cut-offs on site Approach of workers 4.2 REDUCE METALS The greatest method to decrease any metal waste is to order a made to measure bar from the manufacturer, it would be set for use and will not essential any decoration or bending. 4.3 RE-USE OF METALS Principal is to check the prospects on site, and if it is not, you might stock the materials somewhere else, for it to be used another time. When storing the metal, it is necessary to separate it from other metals. Loading trucks are wanted to carrying the metal waste off-site. 4.4 RECYCLING METALS The greatest method to recycle metal is to shift scrap metal by the quantity to local salvage operators, the price of metal differs according to the variety. Materials identical like aluminum will be more valued than say ferrous metals. The metal waste that is made on site, will then be disposed of in the according basket, and additional later dumped into the loading trucks for it to be used somewhere else. 1641988-91588-james-hardy-altopress-maxppp-construction-waste-rebar-from-reinforced-concrete Figure 00: Metal Waste (Steel) Source: http://www.ds-crusher.org/sloution/Construction_Waste_Recycling.html 5. TIMBER The timber creation waste can come in various methods, from pallets which other goods were shipped with, engineered timber and treated timber. Wood wastage typically happens in residential construction industry and renovation works doings as the main produce. This is faced to concrete waste, which is more often produced in commercial sites involving demolition. Other factors such as the geographical location of the site and the framing methods used effect the amount of timber waste made. 5.1 REDUCE TIMBER The method to decrease the timber waste is best that those who are comprise to timber work are proper train with carpentering skill to handle for minimal the off cut or incorrect cut of the measurement. All timber are wanted to store in dry area due to water moisture will damage the timber. 5.2 RE-USE OF TIMBER Most of the timber that are not completely loss are to cut and store for advance use in storage or un-nailing all other timber after use and move them for more use if are refillable. 5.3 RECYCLING TIMBER Chipped timber, off cut and damage timber are

Saturday, January 18, 2020

Air Force One

One is a movie about that the president of the United States of America goes to Moscow, and he gives an inspiring speech about the Aqua's new â€Å"Zero- tolerance† policy with terrorism. However, during the flight home, a amount of terrorists pretend they are the news crew of Russia, and they take over the plane successfully with a betrayer's, who is an agent of Secret Service, help. The president does not level his family and the other hostages, and he choose to fight against the terrorists.Overall, he wins the fight, and the majority of the hostages and the first family has been saved. The First Leadership: President James Marshall President James Marshall deserves as leader. To begin with, as a leader, he Is responsible and brave. When the crawls comes, he does not choose to escape, though he has the chance, he stays with his people, and tries his best to save his people and family from the terrorists. Moreover, as a leader, James has full of positive energy, and he also h as the sense of Justice.This can be proved by according to his words during his speech in Moscow, â€Å"Peace Is not merely the absence of conflict, but the presence of justice. † Furthermore, as a leader, James Marshall is wise. According to this quote, â€Å"If you give a mouse a cookie, it's goanna want a glass of milk. † From this quote, it shows that James Marshall is so wise that he knows he can not compromise with the terrorists because the terrorists will be more and more greedy. Overall, President James Marshall deserves as leader because he is responsible, brave, wise, and has the sense of Justice.The Second Leadership: Vice President Kathy Bennett Vice President Kathy Bennett deserves as leader. First of all, as a leader, she is unruffled and manful enough. When she has heard that the terrorists have hijacked, ND the president, James Marshall, is still alive, she says that, â€Å"If we're going to act, we have to act now. † From this quote, it shows t hat Bennett is very manful, and she knows that if something has been decided, is must be done without hesitate. More importantly, Kathy Bennett is very intelligent.When she knows that the terrorists are armed, she realizes quickly that there must be a betrayer in Secret Service, and this can be proved by this quote, â€Å"How the hell did they get Air Force One? † Finally, Vice President Kathy Bennett deserves as leader because she is unruffled, manful, ND really intelligent. The Third Leadership: Ivan Surrounds Ivan Surrounds is a little chieftain of the terrorists, he deserves as leader. First of all, he is very aggressive, and he can always over his enemy ahead.For instance, â€Å"Your national security adviser has Just been executed. † Moreover, as a leader of terrorists he is very calm. Ivan Isochronous calmness Is easy to be proved. For Instance, before they hijack the plane, he and his men pretend to be the news crew of Russia, and they are so calm that do not s how any slip before the crestless and Secret Service. In conclusion, Ivan Surrounds deserves as leader because he Is really aggressive and very calm even face to face with the enemies.Air Force One By Lie-Jigsaw does not level his family and the other hostages, and he choose to fight against the President James Marshall deserves as leader. To begin with, as a leader, he is responsible and brave. When the crisis comes, he does not choose to escape, though family from the terrorists. Moreover, as a leader, James has full of positive energy, during his speech in Moscow, â€Å"Peace is not merely the absence of conflict, but the reserve of Justice. † Furthermore, as a leader, James Marshall is wise.According to unruffled and manful enough. When she has heard that the terrorists have hijacked, inform national security adviser has Just been executed. † Moreover, as a leader of terrorists he is very calm. Ivan Isochronous calmness is easy to be proved. For instance, before the y hijack the plane, he and his men pretend to be the news crew of Russia, and they are so calm that do not show any slip before the securities and Secret Service. In conclusion, Ivan Surrounds deserves as leader because he is really

Thursday, January 9, 2020

Abolishing Minimum Wage - 1808 Words

Abolishing the Minimum Wage Many Americans think of the minimum wage as a means of raising the income of the working people. However, the minimum wage is not the best way to combat poverty. In fact, the minimum wage does more harm than good. The list of its negative effects is a long one: it causes unemployment; it prevents unskilled workers from getting the on-the-job training they need; it encourages teenagers to drop out of school; it promotes the hiring of illegal aliens; and it increases welfare dependency. For all of these reasons, the minimum wage should be eliminated. To evaluate the minimum wage, we must first understand why it was originally created and what its historical effects have been. The minimum w age was introduced in†¦show more content†¦Several studies have shown in addition that â€Å"increases in the minimum wage lead employers to cut back on both work hours and training† (Bartlett, 1996) and that any further benefits that are gained by an incr eased minimum wage are â€Å"short lived† (Mishel, Bernstein, Schmitt, 1998, p.3). Employers may, for example, try to recoup a loss in profits by reducing benefits such as health care and pension (Reynolds, 2004). Another study conducted by economist David Neumark of Michigan State University in 1995 shows that raising the minimum wage negatively affects school attendance among teenagers. The study reports that teenagers are enticed to leave school early by the higher wagers seemingly made available to them by the minimum wage. Many of these teenagers drop out of school only to find that no permanent jobs are available due to the increase in unemployment caused by the minimum wage. According to policy analyst Bruce Bartlett (1999), in â€Å"1967, 1968, 1974, 1975, 1976, and annually from 1978 through 1981 ......a 10-percent rise in the minimum wage† consistently reduced the employment of teenagers 1% and 3%. Even worse is the fact that when teens cannot find legiti mate jobs, poverty may cause them to resort to crime. Studies by Ohio State University and the University of California in 1977 have flatly concluded that â€Å"increasesShow MoreRelatedThe Pros and Cons of Abolishing Minimum Wage954 Words   |  4 PagesAbolishing Minimum Wage Increase, decrease or abolish minimum wage; which is best for our citizens and our economy? Minimum wage was implemented to help unskilled workers to make a living wage but as time goes on the value of minimum wage has plummet. In my research paper I will provide knowledge about minimum wage such as the history, purpose, benefits and the results. I will also present the pros and cons of abolishing the minimum wage and the increase/decrease of minimum. The minimum wage wasRead MoreThe Minimum Wage Laws Will Secure Prosperity For American Business1024 Words   |  5 Pagesbusinesses and their success, which translates to a monumental importance of need to ensure they are allowed to flourish. The minimum wage law hinders American enterprises in numerous ways. Ultimately, the removal of minimum wage will improve the country’s standard of living by creating more lucrative businesses and also by helping citizen’s needs to be met. Dismantling minimum wage laws will secure prosperity for American business and in turn improve the standard of living for Americans. According toRead More America Needs a Variable Minimum Wage Essay1468 Words   |  6 Pages Minimum wage is the least amount of money that an employer is legally required to pay an employee. It is something that all people in the American workforce know about. It was made to prevent the employer from taking advantage of employees. It is what creates the bare minimum standard of living for the 73.9 million hourly wage workers in the United States. However, there are many different jobs with varying amount of skills that are needed for those jobs. This is where the problem arises becauseRead MoreAmeric How Abolishing The Tipping System1433 Words   |  6 PagesWages in America: How Abolishing the Tipping System Would Make for Smarter Business Practices Tipping is considered a social norm in modern America, but it has not always been a staple part of the service industry. Its pervasiveness is due to tradition rather than being of good modern financial sense. Many people feel very strongly when it comes to dispensing money for services preformed, and most people will base the amount of money they leave by their emotional experience. Because people haveRead More The Working Poor Essay769 Words   |  4 Pagesfactories are shut down and moved to other countries, this takes many American people out of work. Companies are now also importing jobs. This is where employers hire people such as immigrants to work less than minimum wage. For that reason, many Americans are stuck with the other minimum wage, and low-paying jobs that barely get them through life. Because of this, many Americans are working full time jobs that are below the Federal poverty line. These types of people are often called the â€Å"working poor†Read MoreA Brie f Note On The Myanmar Garment Industry Essay1693 Words   |  7 PagesNowadays, buyers’ belief that the workers can be trained for collaborative partnerships with them to improve efficiencies and compliance. The Myanmar garment also has some advantages over other regional garment producers, and authors again point to low wages (lower than everywhere except Bangladesh) and a supply of relatively well-educated labor. In the Myanmar garment sector, as present, production with CMP contracting system with reasonable reasons included with reduce taxes, easy of finance flows withinRead MoreThe Problem Of Youth Unemployment1391 Words   |  6 Pagesis long lasting and can harm an individual’s career opportunities. Economists have conducted a research which determines that the period of unemployment in an individual’s life will negatively impact them in the future because they will earn lower wages. For example, if you are a college or university graduate in Canada wh o is in a recession the unemployment rate will rise by about 5%, that implies a loss in earnings of about 9% annually. (TD Economics) If the social problem of youth unemploymentRead MoreThe Federal Minimum Wage Should Have Negative Effects On Employment1893 Words   |  8 Pagesfederal minimum wage. Stacey Brundson, a single father of two, said he has donated blood to bring in extra cash just to help his family afford the basics. â€Å"Sometimes there’s not enough in my paycheck to make it through the month,† said Brundson (qtd. in Harris). Although numerous conservatives and business owners believe that a modification in the current federal minimum wage will have negative effects on employment, on low-skilled workers, and on consumer’s prices, increasing the federal minimum wageRead MoreA Brief Note On Human Resource Departments Act2906 Words   |  12 Pages Legal and Political The United States is the country with the longest â€Å"culturally acceptable† workweek. The average full time worker works a minimum of thirty-two to a maximum of forty hours per week, to avoid working over time hours. The minimum wage mandated by the federal government is $7.25, but state legislation can choose to raise this wage within their respective state (10 Perez, Thomas 2014). The US is the only country, between the three, that does not obligate companies to offer paidRead MoreDavis Bacon Act9473 Words   |  38 PagesConstruction projects and most contracts for federally assisted constructions exceeding $2,000 required to pay their employees the standard wage and benefit package that workers in the area performing similar work are earning the â€Å"prevailing wage†. Prevailing Wage typically means the local union wage. In government contracting, â€Å"a  prevailing wage  is the hourly wage, benefits and overtime, paid to the majority of workers, laborers, and mechanics within a particular area†. The culprit of all of this

Wednesday, January 1, 2020

The Quartering Act, British Law Opposed by Colonists

The Quartering Act was the name given to a series of British laws of the 1760s and 1770s which required that American colonies provide housing for British soldiers stationed in the colonies. The laws were deeply resented by colonists, created a number of disputes in colonial legislatures, and were noteworthy enough to be referred to in the Declaration of Independence. The Third Amendment to the U.S Constitution is essentially a reference to the Quartering Act, and states explicitly that no soldiers will be lodged in any house in the new nation. While the language in the Constitution seems to refer to private houses, there had not been quartering of British soldiers in the private homes of colonists. In practice, the various versions of the Quartering Act generally required the housing of British troops in barracks or in public houses and inns. Key Takeaways: The Quartering Act The Quartering Act was actually a series of three laws passed by the British Parliament in 1765, 1766, and 1774.Quartering of soldiers in civilian populations would generally be in inns and public houses, not private homes.Colonists resented the Quartering Act as unjust taxation, as it required colonial legislatures to pay to house the troops.References to the Quartering Act appear in the Declaration of Independence and in the U.S. Constitution. History of the Quartering Acts The first Quartering Act was passed by Parliament in March 1765 and was intended to last for two years. The law came about because the commander of British troops in the colonies, General Thomas Gage, sought clarity on how troops kept in America were to be housed. During wartime, troops were housed in a fairly improvisational way, but if they were to stay in America on a permanent basis some provisions had to be made. Under the act, the colonies were required to provide housing and supplies for soldiers in the British Army stationed in America. The new law did not provide for housing soldiers in private residences. However, as the law required that colonists pay to buy suitable vacant buildings as housing for soldiers, it was disliked and widely resented as unjust taxation. The law left many of the details of how it was implemented up to the colonial assemblies (the precursor of state legislatures), so it was fairly easily to circumvent. The assemblies could simply refuse to approve the necessary funds and the law was effectively stymied. When the New York assembly did that in December 1766, the British Parliament retaliated by passing what was called the Restraining Act, which would suspend New York’s legislature until it followed the Quartering Act. A compromise was worked out before the situation became more serious, but the incident demonstrated the controversial nature of the Quartering Act and the importance in which Britain held it. A second Quartering Act, which provided for soldiers to be housed in public houses, was passed in 1766. The quartering of troops among, or even near, the civilian population could lead to tensions. British troops in Boston in February 1770, when faced with a mob throwing rocks and snowballs, fired into a crowd in what became known as the Boston Massacre. The third Quartering Act was passed by Parliament on June 2, 1774, as part of the Intolerable Acts intended to punish Boston for the Tea Party the previous year. The third act required that housing be provided by the colonists at the location of the troop’s assignment. Furthermore, the new version of the act was more expansive, and gave British officials in the colonies power to seize unoccupied buildings to house soldiers. Reaction to the Quartering Act The 1774 Quartering Act was disliked by the colonists, as it was clearly an infringement upon local authority. Yet opposition to the Quartering Act was mainly a part of opposition to the Intolerable Acts. The Quartering Act on its own did not provoke any substantial acts of resistance. Still, the Quartering Act did receive mention in the Declaration of Independence. Among the list of repeated injuries and usurpations attributed to the King was â€Å"For quartering large bodies of armed troops among us.† Also mentioned was the standing army which the Quartering Act represented: He has kept among us, in times of peace, Standing Armies without the Consent of our legislatures. The Third Amendment The inclusion of a separate amendment within the Bill of Rights referring to the quartering of troops reflected conventional American thinking at the time. The leaders of the new country were suspicious of standing armies, and concerns about quartering troops were serious enough to warrant a Constitutional reference to it. The Third Amendment reads: No Soldier shall, in time of peace be quartered in any house, without the consent of the Owner, nor in time of war, but in a manner to be prescribed by law. While quartering troops deserved mention in 1789, the Third Amendment is the least litigated part of the Constitution. As the quartering of troops simply hasnt been an issue, the Supreme Court has never decided a case based on the Third Amendment. Sources: Parkinson, Robert G. Quartering Act. Encyclopedia of the New American Nation, edited by Paul Finkelman, vol. 3, Charles Scribners Sons, 2006, p. 65. Gale Virtual Reference Library.Selesky, Harold E. Quartering Acts. Encyclopedia of the American Revolution: Library of Military History, edited by Harold E. Selesky, vol. 2, Charles Scribners Sons, 2006, pp. 955-956. Gale Virtual Reference Library.The Intolerable Acts. American Revolution Reference Library, edited by Barbara Bigelow, et al., vol. 4: Primary Sources, UXL, 2000, pp. 37-43. Gale Virtual Reference Library.Third Amendment. Constitutional Amendments: From Freedom of Speech to Flag Burning, 2nd ed., vol. 1, UXL, 2008. Gale Virtual Reference Library.